Release informationCurrent Location: Home » Sell » Machinery »

Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork

Click image to view full size image
Brand: -
Model: -
Unit price: Negotiable
MOQ: -0 -
Quantity: Negotiable
Delivery date: Since the payment date Days delivery
Share to:
Inquiry
Company Profile
 
 
Details

Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork

 

Introduction

 

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.

 

 

ZPM-100  Structure Sketch

 

 

 

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ,  tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed. 
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

 the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means 

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can 

be eliminated floor by floor.  
8  Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule. 

Project: Wangjing SOHO center T3 project(Beijing,China)
Contractor: China Constuction First group Construction & Development Co;Ltd.

Product Type: Auto-climbing Formwork


Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork
 
More»Our other products
Tips:This page [Automatic Climbing Formwork For Wangjing SOHO center T3 Project , Tower Formwork] infomation provided by [Beijing Zulin Formwork & Scaffolding Company] ,the enterprise is responsible for the authenticity, accuracy and validity of the information content. www.tradeleo.com do not assume any guarantee of joint and several liability. A safe way to suggest that the two sides trade, to ensure the interests of both sides.

[ Sell search ]  [ Favorites ]  [ Tell friends ]  [ Print ]  [ Close ]

 
HomeSite | About us | Contact Us | Agreement | Copyright | Sitemap | Spread | Guestbook | RSS Feed