Steady, synchronous and safe Auto Self Climbing Formwork QPMX-50

 

Descrition: 

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder 

and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, 

so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is

fast and safe.

 

Structure 


 

The Characteristics 


1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination 

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is

 reduced while the bumping damage is almost completely prevented, especially for the plywood.
5The error of structure construction is tiny and easy to correct.
6The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are 

greatly reduced.

 

 

Standard Climbing Process 


1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete

 pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and

 formwork to the right position, match the formwork and do the second pouring.
3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4. Match the formwork to the right position and do the third pouring.
5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
 

Project:

Melak Bridge project.(Indonesia, kalimantan)

Client:

PT . WASKITA KARYA 

Date:

01/2014

Formwork  Type:

Auto climb formwork , bridge deck formwork for Melak Bridge project
Tips:This page [Auto climb formwork , bridge deck formwork for Melak Bridge project] infomation provided by [Beijing Zulin Formwork & Scaffolding Company] ,the enterprise is responsible for the authenticity, accuracy and validity of the information content. www.tradeleo.com do not assume any guarantee of joint and several liability. A safe way to suggest that the two sides trade, to ensure the interests of both sides.

[ Sell search ]  [ Favorites ]  [ Tell friends ]  [ Print ]  [ Close ]