Release informationCurrent Location: Home » Sell » Metallurgy, Mineral & Energy »

pv screw piles

Click image to view full size image
Brand: -
Model: -
Unit price: Negotiable
MOQ: -0 -
Quantity: Negotiable
Delivery date: Since the payment date Days delivery
Share to:
Inquiry
Company Profile
 
 
Details

Reduction of Construction Duration. Cutting down labor cost and construction dulation are reduced due to no need of curing after work. 

Unnecessary of Concrete. It is eco-frindly construction method not using concrete. 

Unnecessary of Disposal of Surplus Soil. Disposal of surplus soil is not required due to not using excavating work. 

Possible to Reusing. It is possible to install the other place or demolish because it can be pull out by back lashing easily. 


pv screw piles
 
More»Our other products
Tips:This page [pv screw piles] infomation provided by [sungbocheng] ,the enterprise is responsible for the authenticity, accuracy and validity of the information content. www.tradeleo.com do not assume any guarantee of joint and several liability. A safe way to suggest that the two sides trade, to ensure the interests of both sides.

[ Sell search ]  [ Favorites ]  [ Tell friends ]  [ Print ]  [ Close ]

 
HomeSite | About us | Contact Us | Agreement | Copyright | Sitemap | Spread | Guestbook | RSS Feed