Coupling clamp

Click image to view full size image
Unit price: Negotiable
MOQ: Negotiable
Quantity: Negotiable
Delivery date: Since the payment date Days delivery
Share to:
Inquiry
Company Profile
 
 
Details

COUPING CLAMP

 

about XMWY………………………………………………………………………

Chang LI Xing Min Wei Ye(XMWY) Architecture Equipment Limited Corporation was established in 1988. It has been in the scaffold field for many years and developed to be a professional and experienced manufacturer of brand-new scaffold in China. 

With years of exporting experience, XMWY has the capacity of designing and processing different kinds of scaffold props according as customers' requirements. 

 

Specification:………………………………………………………………………  

Coupling Clamp

Diameter

Thickness

(mm)

G.W.

(kg/pc)

Swivel Coupler

48mm*48mm

5

1

Connecting Coupler 

48mm*48mm

5

0.96

Fixed doulble Coupler

48mm*48mm

5

0.9

 

 

Characteristics:……………………………………………………………………

1.Material : Steel; 

2.Standard : BS ,JIS;

3.Surface treatment : Galvanized; 

4.Type: Pressed fixed and swivel clamp;

 

Feature:………………………………………………………………………………

1.Less costing and easy assemble and disassemble without many accessories.

2.Huge Tensile strength and Torsional major rigid. The material flanging thickness is greater than the thickness of the hollow rivet.

3.Large joint area and strong anti-skinning which overcome the weakness that coast iron coupler bonds the steel tube in one point and single line and eliminate the hidden slipping danger.  

4.Durability and resilience maintain the steady joint between steel rail and sleeper.

5.Punched to forming once. With anti-deformed ability, the coupler can reused for many times than coast iron coupler.

6.Easy to repair, costing-saving. 

7.Anti-corrosion. Because of the galvanizing surface treatment, the couple can be reused more times than coast iron coupler.

 

Products picture:…………………………………………………………………

 

Market………………………………………………………………………………

Many countries and regions in Europe, north America, middle east and Asia, example: Libya, Philippine, Mozambique ,India, Bengal , Angola ,Algeria and so on. Warmly welcomed by the customers from worldwide.

 

 

Prospect………………………………………………………………………………

Nowadays steel pipe and timbers are commonly used in the construction site during the concrete pouring. Disadvantages of this structure are obvious, such as a high workload of installation and disassemble, low working efficiency, labor and material wasting, poor quality, ugly and can cot be adjusted. Compared to the traditional scaffolding system the products of XMWY will surely bring a revolutionary reform in the construction formwork and scaffolding area. With great potential prospects of application, our products will undoubtedly bring huge economical and social benefit.

 

 

Best service.…………………………………………………………………………

Feel free to email me with any questions and I will reply you in 24 hours.

Please check out the other items I have up for auction. 

Plenty of “odds & ends” collectables. 

You never know what you may find! 

Thanks & Good Luck!

 


Coupling clamp
 
More»Our other products
Tips:This page [Coupling clamp] infomation provided by [Changli Xingminweiye Architecture Equipment Co., Ltd.] ,the enterprise is responsible for the authenticity, accuracy and validity of the information content. www.tradeleo.com do not assume any guarantee of joint and several liability. A safe way to suggest that the two sides trade, to ensure the interests of both sides.

[ Sell search ]  [ Favorites ]  [ Tell friends ]  [ Print ]  [ Close ]

 
HomeSite | About us | Contact Us | Agreement | Copyright | Sitemap | Spread | Guestbook | RSS Feed